Fire Shuts Down Industrial Coatings Manufacturer
The day after the fire, MAXONS' senior project managers consulted with
the business owners and insurance representatives to identify the
insured's priorities and expectations to develop an emergency
restoration strategy. Once the client's core business operations were
identified, MAXONS' response team worked around the clock to restore the
heavily smoke-damaged 200,000 sq. ft. Westchester, NY manufacturing
facility to reinstate normal operations and facilitate the fulfillment
of all pending product orders.
DAMAGES:
- Manufacturing operations at a standstill
- Acrid smoke odor throughout entire facility
- Stock & Inventory coated with thick, black soot residue
- HVAC systems contaminated by soot particles and smoke odor
- Executive office functions coated in heavy soot residue
- Laboratory & testing equipment smoke-damaged
MAXONS EMERGENCY RESPONSE:
- Loss evaluation, consultation/critical path identified and outlined
for insured.
- Scaffolding erected throughout to access 25-ft corrugated metal
decking
- All heavily smoke-damaged interior surfaces and fixtures
chem-washed
- Product laboratory detail cleaned and testing equipment, checked,
serviced and tested
- HVAC units and ductwork hand-cleaned and decontaminated
- All manufacturing equipment, stock and product inventory
hand-cleaned and deodorized
- Entire facility deodorized with industrial ozone equipment